PROJECT DESCRIPTION

Characteristics of ExploreHouse project,
its basic assumptions and goals

LABORATORY

Description of the laboratory, a list of devices and equipment specification

LIVE PREVIEW

Access to the video stream recorded by cameras installed in the laboratory

PHOTO GALLERIES

Photo galleries showing ExploreHouse project activities

Menu »
  • News
News
 
The installation of electromagnetic flowmeter for measuring the flow rate of medium in the heating system.
 
 
Extension of possibilities measuring electronics, reconfiguration and addition of new modules.
 
   
 
The work associated with the combustion of a mixture of straw and sewage sludge.
 
 
 
The installation of additional heating equipment - Kermi radiators.
 
 
 
Lectures, practice and demonstration of the heating system work in the OZEDay - Renewable Energy Sources Day on AGH-UST.
 
Installation of inverters in the circulation pumps and the fan.
 
A technical review of the boiler and the installation works. Remove old radiators from laboratory.
 
Laboratory training for the participants of Post-graduate course “Environmental engineering” organized by W. Goetl High School of Environmental Engineering. Demonstration of the biomass boiler working and students measurements.
 
 
Begin assembly of cameras in the laboratory.
 
Talks with the technical department of the Faculty of Foundry Engineering, to determine the details of connecting the cameras to a network of faculty.
 
Faculty of Energy and Fuels received the first batch of cameras that will be used for the virtual laboratory, conducted under the project ExploreHouse.
 
Completion of the refurbishment of the hall. Signing of the protocol.
 
The completion of the partition separating the biomass boiler lab from the rest of the hall.
 
Start of renovation works: building a partition wall, removing unnecessary elements of steel and concrete in the hall, installing of lighting and checking of electric system.
 
Signing a contract with "TOMBUDOS" building company
 
Preparing hall to renovation works.
 
Talks between administration of the Faculty of Foundry Engineering and "TOMBUDOS" menagers before the start of renovation of the hall. Finalisation of arrangements for cleaning up the floor area covered by the project.